Design Review Committee approves Town Fair Tire expansion project comments
Design Review Committee · Meeting of May 19, 2026
YARMOUTH — Design Review Committee approves Town Fair Tire expansion comments. The Yarmouth DRC voted 3-0 to accept its formal comments on a proposed 6,576-square-foot tire sales and installation facility at 484 Station Avenue in South Yarmouth, advancing the project to Site Plan Review. Applicant representatives Matt Ashley of Bohler and architect Andrew Milliken presented a design that extends the existing plaza building with matching brick and pitched roof, includes five service bays, reconfigured parking with in-lot plantings, and underground stormwater infiltration.
Committee members confirmed that removed plaza trees would require replanting, potentially as a Zoning Board condition. The applicant reported anticipated peak traffic of seven vehicles and noted the Board of Health has approved additional septic capacity.
In the full story:
- The complete report — 266 words
Source: the Design Review Committee meeting of May 19, 2026, reported from the official video recording and transcript.
Keep reading with a 14-day free trial
Subscribe to Yarmouth News to keep reading this post and get 14 days of free access to the full post archives.
A subscription gets you:
- Subscriber-only posts and full archive
- Post comments and join the community
- 24x7 access to local news